BossaBox

This is the playbook for engineering-playbook

Technical Spike

From Wikipedia

A spike in a sprint can be used in a number of ways:

A distinction can be made between technical spikes and functional spikes. The technical spike is used more often for evaluating the impact new technology has on the current implementation. A functional spike is used to determine the interaction with a new feature or implementation.

Engineering feasibility spikes can also be conducted to de-risk an engagement and increase the team’s understanding.

Deliverable

Generally the deliverable from a Technical Spike should be a document detailing what was evaluated and the outcome of that evaluation. The specifics contained in the document will vary, but there are some general principles that might be helpful.